Parkregler L open transparent

    EZA controller according to VDE4110

    • Our certified grid-tie controller for PV and batteries is available as a complete solution, including control cabinet, UPS, meter, etc.
    • Alternatively, our SmartDog grid-tie controller can also be ordered as a standalone unit.
    • Optionally, we can implement remote control technology, including connection to a grid operator's FWT gateway according to IEC 101/104, without the need for an additional PLC.
    • Connection to a direct marketer is also possible. Commissioning is performed remotely.

     

    Was ist die VDE-AR-N 4110?

    Die Technische Anschlussregel VDE-AR-N 4110 beschreibt die Anforderungen für den Anschluss von Erzeugungsanlagen, Speichern und Ladestationen an das deutsche Mittelspannungsnetz. 

    Sie basiert auf dem Europäischen Netzcode RfG und fordert unter anderem die Bereitstellung von Blindleistung, dynamische Netzstützung sowie strenge Anforderungen an Schutztechnik und Kommunikation. 

    Unsere Erzeugungsanlagensteuerung erfüllt alle Anforderungen der VDE-AR-N 4110, einschließlich zertifizierter Kommunikation, integrierter Fernsteuerungstechnik (IEC 101/104) und aller erforderlichen Dokumentationen für den Netzanschluss.

    More information about VDE-AR-N 4110 can be found on the VDE website.

    Your advantages with our EZA regulator

    Vde4110 parkregler grafik

    From simple systems to complex installations with multiple transformer stations and feed-in points,

    With SmartDog, you're on the safe side!

    Fernwirktechnik Symbolbild

    Integegrated Remote Control Technology - no PLC needed!

    IEC 101 or 104 as well as Analog

    Approval for common network operators

    Simulation capability

    Clear presentation of all data points

    Schema EMS Zähler AC WB DC WB Batterie PV

    Energymanagement 

    Load management for wallboxes

    Battery management

    Excess hot water preparation

    Heat pump Intelligent use of dynamic electricity prices

     

    Parc-controller

    • Our network operator requires remote control technology - from whom can I obtain this?

      Many network operators require the installation of remote control technology even for systems as small as 100 kW.

      With SmartDog, you don't need an additional manufacturer for remote control technology or any additional hardware such as PLCs.

      Whether the remote control technology uses the IEC 101/104 protocol, digital contacts, analog signals, or Modbus TCP, SmartDog always offers the right solution.

      Selecting and configuring the remote control technology is extremely simple and intuitive.

       

    EZA-controller

    • When do I need an EZA regulator?

      For all systems connected to a transformer that can feed in more than 270kW (the sum of PV, CHP, storage counts), you need a certified EZA controller!

    • Can I use any inverter?

      No - the inverter must have a VDE 4110 certificate.

    • Can I use any counter?

      No – VDE 4110 specifies very high accuracy classes for the measuring instruments used.

      Only very high-quality instruments meet these accuracy classes.

      At Ecodata, you receive a package that fulfills all requirements!

       

    • What does the certifier need regarding the EZA regulator?

      This requires the component certificate for the EZA controller – we can provide that.

      It also requires a commissioning report for the EZA controller with the configuration settings – we can provide that as well.

      In many cases, proof of the controller's operation is required.

      This can be more or less complex depending on the grid operator – we can provide this proof as well.

       

       

       

    • What information does Ecodata need from me?

      We need the following information:

      • Who is the grid operator?
      • Is there power measurement at the grid connection point (GSP)?
      • Is there power measurement for PV generation?
      • Which inverter manufacturers are being used?
      • Is a direct marketer to be integrated?
      • Does the grid operator require remote control technology, and should this be supplied by Ecodata?
      • We need the grid operator's E9 questionnaire.

         

      Feel free to use our interactive park controller inquiry form and receive a customized offer!

      https://beta.ecodata-sl.de/de/kontakt-support/parkregleranfrage#form

    • How long is the delivery time for an EZA controller control cabinet?

      Currently, depending on the model, the delivery time is between two and five weeks. 

      However, delivery times may vary depending on capacity and supply chains.

    Parc-controller generally

    • Why should I use SmartDog as a parking controller?

      So you can focus on your core business and avoid unpleasant surprises during commissioning. 

      From delivery of the parking controller and selection advice to remote commissioning, we are your partner every step of the way!

      If you have any questions, our partner hotline and ticket support are available to assist you.